California Rule 4306 |
||||
|
Units to be in compliance at a stationary source |
Emission Control Plan (ECP) |
Authority to Construct (ATC) |
Full Compliance |
|
|
Group 1 |
At least 25% of the total number of units subject to this rule on June 1, 2005, excluding Group 4 = if 1 unit or 1st unit if up to 4 total, 1st and 2nd unit if 5-8 total, 1st , 2nd, and 3rd units if > 8 total, etc. |
|
|
|
|
Group 2 |
At least 62.5% of the total number of units subject to this rule on June 1, 2006, excluding Group 4 = 2nd unit if 2 or 3 total, 2nd and 3rd units if up to 4 total, 2nd, 3rd and 4th units if 5-6 total, etc. |
|
|
|
|
Group 3 |
100% of the total number of units
subject to this rule on |
|
|
|
|
Group 4 |
A. Load-following units B. Units
limited by Permit to Operate to an annual capacity factor of 10% or
less as of C. Category I units at any stationary source that has no more than two units subject to this rule. |
|
|
|
|
California Rule 4306 |
||||
|
Units to be in compliance at a stationary source |
Emission Control Plan (ECP) |
Authority to Construct (ATC) |
Full Compliance |
|
|
Group 1 |
At least 25% of the total number of units subject to this rule on June 1, 2005, excluding Group 4 = if 1 unit or 1st unit if up to 4 total, 1st and 2nd unit if 5-8 total, 1st , 2nd, and 3rd units if > 8 total, etc. |
|
|
|
|
Group 2 |
At least 62.5% of the total number of units subject to this rule on June 1, 2006, excluding Group 4 = 2nd unit if 2 or 3 total, 2nd and 3rd units if up to 4 total, 2nd, 3rd and 4th units if 5-6 total, etc. |
|
|
|
|
Group 3 |
100% of the total number of units
subject to this rule on |
|
|
|
|
Group 4 |
A. Load-following units
|
|
|
|
Important Definitions:
Load-following Unit: For the purposes of this rule,
a load-following unit is defined as a unit with normal operating load fluctuations
and requirements which exceed the operational response range of an Ultra-Low
NOx burner system(s) operating at 9 ppmv NOx. The operator shall designate load-following
units on the Permit to Operate.
Emission Control Plan (ECP): The ECP shall identify
all units that are subject to this rule and the steps to be taken to achieve
compliance. The ECP shall contain the following minimum information:
Authority to Construct (ATC): An ATC Application must
be submitted by the owner/operator for each unit subject to this rule.
Full Compliance: Owner must demonstrate that each unit
is in compliance with this rule.